Agroflores: Production Notes on a Short-Form Brand Film
By Nora Vance · Published · 5 min read

Agroflores is a short-form brand production built around a simple idea: show the work behind the flowers, not just the finished bouquet. The piece runs under two minutes in its main cut, with vertical and square versions for social, and it was made by a small crew over two shooting days on a working growing site.
This page collects what the production actually involved — the concept, the practical decisions on set, the gear, and the delivery package — with the numbers and trade-offs that shaped it. It is written for producers and directors planning something similar at a modest budget.
Concept and Treatment
The brief asked for a piece that felt like a portrait rather than an advert. The treatment settled on three threads: hands at work, the colour and texture of the crop, and the quiet rhythm of a day that starts before light. That gave the edit a clear spine and kept the shot list honest — every setup had to serve one of those threads or it was cut from the plan.
We wrote a one-page treatment with six reference frames and a short written tone note: no voiceover, no music-led montage until the final fifteen seconds, and natural sound carrying the opening. Locking that down early meant the client could sign off on a direction before anyone touched a camera, which saved a round of revisions later.
Because the piece was never meant to run long, the concept was built for brevity from the start. The main cut sits at around 105 seconds, and we planned coverage knowing that at least a third of what we shot would only ever appear in the vertical versions. That shaped how we framed — looser, with headroom for a 9:16 crop.
- Six reference frames, one page of treatment
- No voiceover; natural sound for the first 20 seconds
- Every setup mapped to one of three visual threads
- Framing planned for both 16:9 and 9:16 crops
Pre-Production and Scheduling
Pre-production ran about three weeks, which is tight but workable for a piece this size. The main constraint was access: the growing site could only host us on two consecutive days, and the light-dependent shots had to land at specific hours. We built the schedule backwards from golden hour and grouped everything else around it.
The location recce mattered more than usual because we had no second site. Walking the ground a week out, we marked four natural camera positions and noted where the sun would be at each hour. That single visit removed most of the on-the-day guesswork and let us keep the crew to six people, including talent.
Paperwork was deliberately boring. A single call sheet covering both days, with a separate page for the sunrise start, meant nobody had to guess where to be at 5:40am. If you are running a similarly compact schedule, our guide to planning a two-day shoot without overtime covers the sequencing logic we borrowed.
- Three weeks of prep, two shooting days
- Access limited to two consecutive days on site
- Four pre-marked camera positions from the recce
- Six-person crew including talent
| Stage | Duration | Crew / Resources | Key Output |
|---|---|---|---|
| Development and treatment | 1 week | Director, producer | One-page treatment, six reference frames |
| Pre-production and recce | 2 weeks | Producer, DP, one site visit | Shot list, schedule, two-day call sheet |
| Principal photography | 2 days | Six-person crew, two bodies | About 340GB of rushes |
| Edit and review | 9 working days | Editor, director, 2 client rounds | Main cut at 1:45 |
| Colour, sound, finishing | 3 working days | Colourist, sound editor | Graded master, mixed audio |
| Delivery | 1 day | Editor, producer | 11 files across four aspect versions |
Shooting Approach
We shot on two mirrorless bodies with fast primes — roughly a 35mm and an 85mm equivalent covering most setups — plus a macro for the detail inserts. That kit is unglamorous but fast to move, and on a site with uneven ground and no power, speed beats specifications. Spare batteries and cards were doubled; we burned through four batteries per body per day in the cold morning hours.
Lighting was almost entirely natural, with a single 1x1 LED and a bounce for the interior packing shots where the ambient fell off. The macro inserts were shot at around f/4 to hold a little depth, handheld with support from a beanbag. Roughly 60% of the material was captured before 10am because that was when the light and the activity lined up.
We recorded sound separately for the key natural-sound moments — secateurs, crates, water — with a small recorder and a shotgun mic, because on-camera audio would not have held up in the mix. Total footage came to about 340GB across both days, which is modest for a project this length and kept the edit manageable.
- Two mirrorless bodies, 35mm and 85mm primes, one macro
- Single LED plus bounce for interior setups
- About 60% of footage captured before 10am
- Separate audio recorder for natural sound
- Around 340GB of rushes across two days
Post-Production and Delivery
The edit took nine working days including two client review rounds. We cut the main piece first, then derived the vertical and square versions from the same selects rather than starting fresh — that keeps the tone consistent and halves the decision-making. The main cut landed at 1:45, with a 30-second teaser and three 15-second verticals.
Colour was kept warm but restrained; the temptation with flowers is to push saturation until it looks like stock footage. We graded to protect the greens and let the blooms carry the colour. Sound design was mostly the recorded naturals with a licensed music bed entering at the 80-second mark and running to the end.
Delivery was a single package: ProRes masters, H.264 broadcast-safe files, and platform-ready verticals with captions burned in and as sidecar files. Total deliverables came to eleven files. If your own project is heading toward a similar spread, it is worth reading how many deliverables you actually need before you promise a number in the contract.
- Nine working days of post, two review rounds
- Main cut 1:45; teaser 0:30; three 15-second verticals
- Colour graded to protect greens, restrained saturation
- Eleven delivery files including captioned versions
Budget Reality
The production came in at a low five-figure sum, with the largest single line being crew and the second being post. Locations cost nothing beyond travel and a modest site fee, which is unusual and worth acknowledging — the project benefited from a cooperative host. Gear was largely owned, so rental was limited to the macro lens and the audio kit.
Contingency was set at around 10% and roughly half of it was spent, mostly on an extra half-day of post when the vertical versions needed re-framing. That is a common pattern: the main cut is planned for, and the cutdowns quietly eat the buffer. Budgeting the derivatives as a separate line rather than an afterthought is the fix.
For a fuller breakdown of how these numbers are typically structured, our piece on short film line items that actually matter maps closely onto how this production was costed.
What We Would Change
Two things. First, we would shoot the vertical versions deliberately rather than relying on re-framing — about a third of the 9:16 material needed reframing in post, and a second pass with the phone rig would have been faster and better. Second, we would schedule the natural-sound capture as its own block instead of grabbing it between setups, which cost us an hour of scrambling.
The location recce, the one-page treatment, and the single two-day call sheet all worked and should be repeated. The lesson is not that the production was flawless but that the constraints — two days, six people, one site — forced decisions early, and early decisions are what keep a small shoot on budget.
Choosing a Camera Package
The mirrorless-versus-cinema-body question came up in prep and we went with mirrorless for mobility and cost. For a piece with this much handheld work and this little controlled lighting, that was the right call. A larger sensor body would have added weight and data without changing the finished film.
If you are weighing the same decision for client-facing work, choosing between DSLR and cinema cameras lays out the trade-offs in more detail. Our rule of thumb: match the camera to the shooting conditions, not to the deliverables list.
- A one-page treatment with reference frames gets client sign-off faster than a long deck.
- Shoot vertical versions deliberately; re-framing in post costs more than a second pass on set.
- Budget cutdowns as their own line — they are where contingency quietly disappears.
- Two days and six people is enough for a sub-two-minute piece if the recce is done properly.
Nora reviews gear and post-production tools with an eye on real-world budgets and turnaround times. Her articles help teams choose equipment and workflows that fit their scale.